As our summer finally begins, we say farewell to the winter season
again. As this continuous cycle persists, the Highway Department
remains busy. The snow removal equipment has been removed and the
chipper and mowers have taken their place.
Our chipping schedule remains the same as in years past, from April
through June. We DO NOT chip in July and August. The summer months
are reserved for our paving projects. We will resume chipping Sept.
1 and chip brush throughout the fall until the first snowfall.
Mulch that has been available to residents in the past has been
temporarily put on hold. The Highway Department will use the mulch
to build up the nature trail in the Town Park. When that is
complete, mulch will be available to the residents again.
The Town of Cambria is no longer mowing roadsides along State
roadways. NYS has resumed responsibility for their own roadsides
and should you have a concern regarding a state road, your inquiries
should be directed to them. The Niagara County residency for the
NYS DOT phone number is 438-2396.
We are continuing to complete ditching projects that have been
approved by the Drainage Committee. There is a ditching policy in
effect for the Town and minor ditches and swales are not the
responsibility of the Town. For further explanation of this policy,
please call the Highway Department.
As more homes are constructed in our beautiful community, I would
like to remind property owners that we have a driveway culvert
permit that must be signed before installing a culvert along a Town
road. The town does not have to install the pipe, but it must be
approved by the Highway Superintendent and a $50.00 set up fee must
be paid if a private contractor installs the pipe. Please be aware
that the Town reserves the right to remove any pipe that has not
been properly installed and permit not approved.
Road projects for 2010 will be thoroughly evaluated. With blacktop
prices almost doubling in five years, we have to maintain our roads
and pick priority jobs first in hopes of keeping up with
preservation of our existing roads. Many of our culvert crossings
have deteriorated and must be replaced before the road can be
repaired. This is an expensive task but must be completed.
The Town Park has drainage in the baseball diamond and the backstop
has been installed. The soccer field is being built up and
landscaping around the pond has begun. We will work on completing
the ball diamond and dugouts and mulching around the 100 trees that
were planted in the fall. Pavilions and walking paths are next on
the projected list of things to do.
Please stop by this
summer and take advantage of the park. It’s progressing nicely and
it is there for your enjoyment. Enjoy the summer months in our
beautiful community!
Download a Driveway
Culvert Permit Form
Click on this
Driveway Culvert link
to
open the form in a PDF format. Print and mail the completed form to
the following address.
Town of Cambria
Highway
4164 Upper Mountain Rd.
Sanborn, NY
14132-9416
Or you may fax:
716-433-2940
If you do not have
Adobe Acrobat Reader click
here
for a free download
As always if you have any concerns,
please feel free to call the Highway Department at 716-433-8829 and
we will help you any way we can.
|